Our Gammon Energy Saver Building system transforms construction into a precise, factory-controlled process. Every component is pre-engineered and produced with embedded plumbing, electrical conduits, window cutouts, and door frames — ready for rapid on-site assembly.

Have a Look at Our Construction Process

Foundation Digging - Precise excavation based on soil report and structural design. Minimal footprint, maximum stability.

Water Bond / Gravel Placement - Clean, compacted gravel layer ensures drainage and stable load distribution.

Foundation Placement 5ft × 5ft precast foundation - high strength concrete with steel reinforcement — featuring a central hollow pocket for column insertion. Craned in, laser-leveled.

Column Placement & Grouting - Precast columns craned into position, aligned, and locked with high-strength grout.

Grouting & Backfilling - All joints fully grouted. Controlled backfill restores ground stability.

Plinth & Subflooring - Precast plinth beams and insulated subfloor panels installed — underground conduits pre-embedded, level and ready for wall erection.

Wall Panel Insertion & Bracing - Crane-lifted sandwich wall panels (with pre-installed plumbing, electrical, window cutouts, and door frames) slotted in and braced.

Roof Installation - Precast roof slabs or trusses craned in, sealed, and weatherproofed

Gray structure complete, Roof Concrete Done with Water Proofing Membrane

Factory-Integrated Features

All plumbing & electrical pipes cast into walls during production — per plan.

Windows pre-cut, door frames pre-installed — no cutting on-site.

Perfect joints, no leaks, no delays.

Timeline

Factory Production ( 1 Kanal House) : 7-10 days

Gray Structure Installation (Post Production) : 14-20 Days

Finishing And Key Handover: 1-2 months